{"id":1131236,"date":"2026-09-09T14:42:36","date_gmt":"2026-09-09T06:42:36","guid":{"rendered":"https:\/\/www.dottedsign.com\/blog\/?p=1131236"},"modified":"2026-09-09T14:56:22","modified_gmt":"2026-09-09T06:56:22","slug":"construction-approval-cycles","status":"publish","type":"post","link":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles","title":{"rendered":"Why Construction Projects Lose Time During Approval Cycles\u2014and How Digital Signatures Help"},"content":{"rendered":"\n<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_80 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Quick_Answer\" >Quick Answer<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Key_Takeaways\" >Key Takeaways<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Construction_Projects_Move_at_the_Speed_of_Decisions\" >Construction Projects Move at the Speed of Decisions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#What_Is_a_Construction_Approval_Cycle\" >What Is a Construction Approval Cycle?<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Why_Approval_Cycles_Become_Bottlenecks\" >Why Approval Cycles Become Bottlenecks<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Why_This_Matters_for_Texas_Contractors\" >Why This Matters for Texas Contractors<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#What_Faster_Approval_Cycles_Look_Like\" >What Faster Approval Cycles Look Like<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Better_Visibility_Leads_to_Better_Decisions\" >Better Visibility Leads to Better Decisions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#How_DottedSign_Helps_Accelerate_Approval_Cycles\" >How DottedSign Helps Accelerate Approval Cycles<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Best_Practices_for_Faster_Approval_Cycles\" >Best Practices for Faster Approval Cycles<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Frequently_Asked_Questions\" >Frequently Asked Questions<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-12\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Every_Approval_Is_a_Decision_That_Keeps_Projects_Moving\" >Every Approval Is a Decision That Keeps Projects Moving<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-13\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\/#Ready_to_Improve_Your_Construction_Approval_Workflows\" >Ready to Improve Your Construction Approval Workflows?<\/a><\/li><\/ul><\/nav><\/div>\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Quick_Answer\"><\/span><strong>Quick Answer<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Construction projects often lose time not because work stops, but because decisions stop. Manual approval cycles built around email, paper documents, and disconnected communication create bottlenecks that delay work authorizations, change orders, inspections, and vendor agreements. Digital approval workflows help construction teams route, track, and complete approvals faster while giving everyone visibility into document status.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Key_Takeaways\"><\/span><strong>Key Takeaways<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Approval delays are one of the most common hidden causes of project slowdowns.<\/li>\n\n\n\n<li>Manual routing makes it difficult to know where documents are or who needs to act next.<\/li>\n\n\n\n<li>Faster approvals improve scheduling, subcontractor coordination, and project visibility.<\/li>\n\n\n\n<li>Mobile document workflows help office and field teams stay connected.<\/li>\n\n\n\n<li>Digital approval workflows reduce administrative work while supporting compliance.<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Construction_Projects_Move_at_the_Speed_of_Decisions\"><\/span>Construction Projects Move at the Speed of Decisions<span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Every construction project depends on a series of approvals.<\/p>\n\n\n\n<p>Before materials are ordered, someone approves a purchase request.<\/p>\n\n\n\n<p>Before additional work begins, <a href=\"https:\/\/www.dottedsign.com\/blog\/product\/digital-change-orders-texas-contractors\">someone approves a change order<\/a>.<\/p>\n\n\n\n<p>Before a subcontractor starts, agreements and compliance documents must be completed.<\/p>\n\n\n\n<p>These approval cycles happen every day across every project.<\/p>\n\n\n\n<p>When they move quickly, construction keeps moving.<\/p>\n\n\n\n<p>When they don&#8217;t, schedules begin to slip\u2014even if crews, materials, and equipment are ready to go.<\/p>\n\n\n\n<p>For many Texas contractors, project delays aren&#8217;t caused by labor shortages or supply chains alone. They&#8217;re caused by approval processes that rely on paper documents, email threads, and manual follow-ups.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-gates-diagram-1024x576.png\" alt=\"Three construction approval gates: purchase request, change order, and subcontractor agreement\" class=\"wp-image-1131321\" srcset=\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-gates-diagram-1024x576.png 1024w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-gates-diagram-300x169.png 300w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-gates-diagram-768x432.png 768w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-gates-diagram-1536x864.png 1536w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-gates-diagram.png 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Is_a_Construction_Approval_Cycle\"><\/span><strong>What Is a Construction Approval Cycle?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>A construction approval cycle is the process a document follows before work can continue.<\/p>\n\n\n\n<p>Depending on the document, approvals may involve:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project managers<\/li>\n\n\n\n<li>Superintendents<\/li>\n\n\n\n<li>Owners<\/li>\n\n\n\n<li>Architects<\/li>\n\n\n\n<li>Accounting teams<\/li>\n\n\n\n<li>Procurement<\/li>\n\n\n\n<li>Subcontractors<\/li>\n<\/ul>\n\n\n\n<p>Common documents that require approval include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Change orders<\/li>\n\n\n\n<li>RFIs<\/li>\n\n\n\n<li>Work authorizations<\/li>\n\n\n\n<li>Purchase requests<\/li>\n\n\n\n<li>Safety documentation<\/li>\n\n\n\n<li>Inspection reports<\/li>\n\n\n\n<li>Vendor agreements<\/li>\n\n\n\n<li>Project closeout documents<\/li>\n<\/ul>\n\n\n\n<p>The more people involved, the greater the opportunity for delays if the process isn&#8217;t clearly managed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_Approval_Cycles_Become_Bottlenecks\"><\/span><strong>Why Approval Cycles Become Bottlenecks<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Cause<\/strong><\/td><td>I<strong>mpact on the project<\/strong><\/td><\/tr><tr><td>Documents get lost in email<\/td><td>Managers search inboxes instead of reviewing<\/td><\/tr><tr><td>Nobody knows who has the document<\/td><td>Time goes to tracking, not deciding<\/td><\/tr><tr><td>Sequential approvals create delays<\/td><td>One unavailable reviewer stalls everything behind them<\/td><\/tr><tr><td>Paper doesn&#8217;t move at the speed of construction<\/td><td>Printing, scanning, and mailing add steps<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Approval delays rarely happen because people aren&#8217;t working.<\/p>\n\n\n\n<p>More often, they happen because the process lacks visibility.<\/p>\n\n\n\n<p>Here are some of the most common causes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Documents Get Lost in Email<\/strong><\/h3>\n\n\n\n<p>Construction teams exchange hundreds of emails every week.<\/p>\n\n\n\n<p>Important approvals can easily become buried beneath project updates, vendor communications, and client correspondence.<\/p>\n\n\n\n<p>Instead of reviewing documents, project managers spend valuable time searching inboxes and sending follow-up emails.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Nobody Knows Who Has the Document<\/strong><\/h3>\n\n\n\n<p>One of the biggest frustrations with manual approvals is uncertainty.<\/p>\n\n\n\n<p>Has accounting reviewed it?<\/p>\n\n\n\n<p>Is the owner waiting to sign?<\/p>\n\n\n\n<p>Did the subcontractor receive the latest version?<\/p>\n\n\n\n<p>Without visibility into the approval process, teams spend more time tracking documents than making decisions.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Sequential Approvals Create Delays<\/strong><\/h3>\n\n\n\n<p>Many construction documents require multiple approvals in a specific order.<\/p>\n\n\n\n<p>If one reviewer is unavailable, every approval behind them stops.<\/p>\n\n\n\n<p>The result is a chain reaction that slows purchasing, scheduling, inspections, and field work.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Paper Doesn&#8217;t Move at the Speed of Construction<\/strong><\/h3>\n\n\n\n<p>Construction teams are constantly moving between offices, meetings, and job sites.<\/p>\n\n\n\n<p>Paper documents often require printing, scanning, mailing, or returning to the office.<\/p>\n\n\n\n<p>Every extra step adds time to the approval process.<\/p>\n\n\n\n<p>Meanwhile, projects continue waiting.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Why_This_Matters_for_Texas_Contractors\"><\/span><strong>Why This Matters for Texas Contractors<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/www.dottedsign.com\/solutions\/construction\/\">Construction activity across Texas continues to expand<\/a>, from commercial developments in Dallas and Austin to energy, manufacturing, and infrastructure projects throughout Houston and San Antonio.<\/p>\n\n\n\n<p>Growth brings opportunity\u2014but it also increases operational complexity.<\/p>\n\n\n\n<p>Larger projects generate more:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Vendors<\/li>\n\n\n\n<li>Subcontractors<\/li>\n\n\n\n<li>Change orders<\/li>\n\n\n\n<li>Inspection reports<\/li>\n\n\n\n<li>Compliance documentation<\/li>\n\n\n\n<li>Internal approvals<\/li>\n<\/ul>\n\n\n\n<p>Without efficient approval workflows, administrative work grows just as quickly as project volume.<\/p>\n\n\n\n<p>For mid-market contractors, improving approval cycles is one of the simplest ways to scale operations without hiring additional administrative staff.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"What_Faster_Approval_Cycles_Look_Like\"><\/span><strong>What Faster Approval Cycles Look Like<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p><a href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-workflows-that-slow-projects\">Modern construction workflows eliminate many of the manual steps that slow projects<\/a>.<\/p>\n\n\n\n<p>Instead of routing documents through email and paper files, approvals move through one centralized workflow.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Manual Approval Process<\/strong><\/td><td><strong>Digital Approval Workflow<\/strong><\/td><\/tr><tr><td>Print documents<\/td><td>Send digitally<\/td><\/tr><tr><td>Email attachments<\/td><td>Automatic routing<\/td><\/tr><tr><td>Manual reminders<\/td><td>Real-time notifications<\/td><\/tr><tr><td>Unclear document status<\/td><td>Live approval tracking<\/td><\/tr><tr><td>Paper filing<\/td><td>Centralized document storage<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Instead of asking, <em>&#8220;Who has the document?&#8221;<\/em> project teams can immediately see where every approval stands.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Better_Visibility_Leads_to_Better_Decisions\"><\/span><strong>Better Visibility Leads to Better Decisions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>One of the biggest advantages of digital approval workflows isn&#8217;t just speed\u2014it&#8217;s visibility.<\/p>\n\n\n\n<p>Project managers can quickly identify:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Documents waiting for approval<\/li>\n\n\n\n<li>Completed approvals<\/li>\n\n\n\n<li>Overdue reviews<\/li>\n\n\n\n<li>Outstanding signatures<\/li>\n\n\n\n<li>Finalized project records<\/li>\n<\/ul>\n\n\n\n<p>That visibility helps teams resolve bottlenecks before they affect schedules, subcontractor coordination, or client communication.<\/p>\n\n\n\n<p>Rather than reacting to delays, construction teams can proactively keep projects moving.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"How_DottedSign_Helps_Accelerate_Approval_Cycles\"><\/span><strong>How DottedSign Helps Accelerate Approval Cycles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Construction projects generate hundreds of approvals across every phase of a build.<\/p>\n\n\n\n<p>From work authorizations and RFIs to subcontractor agreements and project closeouts, every document represents an important decision.<\/p>\n\n\n\n<p>DottedSign provides one centralized platform where construction teams can:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Route documents for approval<\/li>\n\n\n\n<li><a href=\"https:\/\/www.dottedsign.com\/features\/collect-esignature\/\">Collect secure electronic signatures<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/www.dottedsign.com\/features\/document-tracking\/\">Track approval status in real time<\/a><\/li>\n\n\n\n<li>Create reusable document templates<\/li>\n\n\n\n<li>Enable mobile approvals from virtually anywhere<\/li>\n\n\n\n<li>Store completed records with secure audit trails<\/li>\n<\/ul>\n\n\n\n<p>Whether approvals happen in the office or on the job site, everyone works from the same document with complete visibility into its progress.<\/p>\n\n\n\n<p>For contractors with existing project management platforms, <a href=\"https:\/\/www.dottedsign.com\/esignature-api\/\">DottedSign&#8217;s API<\/a> also allows electronic signatures to be integrated directly into existing workflows, reducing manual steps without disrupting current operations.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Best_Practices_for_Faster_Approval_Cycles\"><\/span><strong>Best Practices for Faster Approval Cycles<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Construction companies looking to improve operational efficiency should consider these best practices:<\/p>\n\n\n\n<p>\u2705 Standardize approval workflows across projects<\/p>\n\n\n\n<p>\u2705 Reduce unnecessary approval steps<\/p>\n\n\n\n<p>\u2705 Enable mobile approvals for field teams<\/p>\n\n\n\n<p>\u2705 Track every document in one centralized location<\/p>\n\n\n\n<p>\u2705 Use reusable templates for recurring documents<\/p>\n\n\n\n<p>\u2705 Maintain secure audit trails for compliance and project closeouts<\/p>\n\n\n\n<p>Small improvements to approval workflows can reduce administrative effort while helping projects stay on schedule.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Frequently_Asked_Questions\"><\/span><strong>Frequently Asked Questions<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<div class=\"schema-faq wp-block-yoast-faq-block\"><div class=\"schema-faq-section\" id=\"faq-question-1788934192430\"><strong class=\"schema-faq-question\"><strong>Why do construction approval cycles take so long?<\/strong><\/strong> <p class=\"schema-faq-answer\">Approval cycles often slow down because documents move through multiple reviewers using email, paper forms, and manual follow-ups. Limited visibility makes it difficult to know where documents are or who needs to approve them next.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1788934202442\"><strong class=\"schema-faq-question\"><strong>Which construction documents benefit from digital approvals?<\/strong><\/strong> <p class=\"schema-faq-answer\">Change orders, RFIs, inspection reports, subcontractor agreements, purchase requests, safety documentation, vendor onboarding forms, and project closeout documents are all commonly managed through digital approval workflows.<\/p> <\/div> <div class=\"schema-faq-section\" id=\"faq-question-1788934220947\"><strong class=\"schema-faq-question\"><strong>Can project managers approve documents from a mobile device?<\/strong><\/strong> <p class=\"schema-faq-answer\">Yes. Modern document workflow platforms allow approvals from smartphones, tablets, and computers, helping office and field teams stay connected regardless of location.<\/p> <\/div> <\/div>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Every_Approval_Is_a_Decision_That_Keeps_Projects_Moving\"><\/span><strong>Every Approval Is a Decision That Keeps Projects Moving<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>Construction projects don&#8217;t slow down because teams stop working.<\/p>\n\n\n\n<p>They slow down because decisions get delayed.<\/p>\n\n\n\n<p>By replacing manual approval processes with digital workflows, Texas contractors can reduce administrative bottlenecks, improve visibility across every project, and help teams spend less time chasing signatures and more time moving work forward.<\/p>\n\n\n\n<p>Construction doesn&#8217;t slow down.<\/p>\n\n\n\n<p>Your approval process shouldn&#8217;t either.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><span class=\"ez-toc-section\" id=\"Ready_to_Improve_Your_Construction_Approval_Workflows\"><\/span><strong>Ready to Improve Your Construction Approval Workflows?<\/strong><span class=\"ez-toc-section-end\"><\/span><\/h2>\n\n\n\n<p>DottedSign helps Texas construction teams route, approve, track, and manage project documents from one centralized platform. Whether you&#8217;re coordinating change orders, work authorizations, inspections, or subcontractor agreements, digital approval workflows help eliminate bottlenecks and keep projects moving from the office to the job site.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/creativestore.kdanmobile.com\/subscription\/dottedsignbusiness\/checkout?default-plan=com_kdanmobile_stripe_dottedsign_business_365days_002&amp;default-coupon=DSBIZ14FREEblog&amp;_gl=1*1bkupwl*_gcl_au*MTgzNDIzMDY3Ni4xNzgyOTc3NjI2*_ga*NzA4MjE3NjM4LjE3ODI5Nzc2MjY.*_ga_EV30J8WN00*czE3ODg5MTk4MTQkbzEyNSRnMSR0MTc4ODkyNTIzNCRqMTAkbDAkaDA.\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"335\" src=\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/Your-Business-Growth-Starts-Here-with-DottedSign_1-2-1024x335.png\" alt=\"\" class=\"wp-image-1131257\" srcset=\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/Your-Business-Growth-Starts-Here-with-DottedSign_1-2-1024x335.png 1024w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/Your-Business-Growth-Starts-Here-with-DottedSign_1-2-300x98.png 300w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/Your-Business-Growth-Starts-Here-with-DottedSign_1-2-768x252.png 768w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/Your-Business-Growth-Starts-Here-with-DottedSign_1-2-1536x503.png 1536w, https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/Your-Business-Growth-Starts-Here-with-DottedSign_1-2.png 2000w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Approval cycles are a hidden cause of construction delays. A look at where they break down, and what Texas contractors gain from digital routing and real-time tracking.<\/p>\n","protected":false},"author":35,"featured_media":1131309,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[138],"tags":[47,189,135,18],"class_list":["post-1131236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-product","tag-b2b","tag-contract-management","tag-digital-transformation","tag-workflow"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.7 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Why the Construction Approval Process Stalls | DottedSign<\/title>\n<meta name=\"description\" content=\"Why the construction approval process slows projects down, and how digital approval workflows help Texas contractors decide faster with full visibility.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Why the Construction Approval Process Stalls | DottedSign\" \/>\n<meta property=\"og:description\" content=\"Why the construction approval process slows projects down, and how digital approval workflows help Texas contractors decide faster with full visibility.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-09T06:42:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-09T06:56:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1536\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Iris\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Iris\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#article\",\"isPartOf\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\"},\"author\":{\"name\":\"Iris\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/44bdc62ef073ef5283eaf1fecef2a045\"},\"headline\":\"Why Construction Projects Lose Time During Approval Cycles\u2014and How Digital Signatures Help\",\"datePublished\":\"2026-09-09T06:42:36+00:00\",\"dateModified\":\"2026-09-09T06:56:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\"},\"wordCount\":1220,\"image\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg\",\"keywords\":[\"B2B\",\"contract management\",\"Digital Transformation\",\"workflow\"],\"articleSection\":[\"Product\"],\"inLanguage\":\"en-US\"},{\"@type\":[\"WebPage\",\"FAQPage\"],\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\",\"url\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\",\"name\":\"Why the Construction Approval Process Stalls | DottedSign\",\"isPartOf\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg\",\"datePublished\":\"2026-09-09T06:42:36+00:00\",\"dateModified\":\"2026-09-09T06:56:22+00:00\",\"author\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/44bdc62ef073ef5283eaf1fecef2a045\"},\"description\":\"Why the construction approval process slows projects down, and how digital approval workflows help Texas contractors decide faster with full visibility.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#breadcrumb\"},\"mainEntity\":[{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934192430\"},{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934202442\"},{\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934220947\"}],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage\",\"url\":\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg\",\"contentUrl\":\"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg\",\"width\":1536,\"height\":1024,\"caption\":\"Construction project manager reviewing construction document approvals on a tablet in a jobsite office\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u9996\u9801\",\"item\":\"https:\/\/www.dottedsign.com\/blog\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Why Construction Projects Lose Time During Approval Cycles\u2014and How Digital Signatures Help\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/#website\",\"url\":\"https:\/\/www.dottedsign.com\/blog\/\",\"name\":\"\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.dottedsign.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/44bdc62ef073ef5283eaf1fecef2a045\",\"name\":\"Iris\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/61e84ca1adb5f0ef3cd6a2ddad5f7718c3742518581cbafe8a35cc0022bb03c3?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/61e84ca1adb5f0ef3cd6a2ddad5f7718c3742518581cbafe8a35cc0022bb03c3?s=96&d=mm&r=g\",\"caption\":\"Iris\"},\"url\":\"https:\/\/www.dottedsign.com\/blog\/author\/iris\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934192430\",\"position\":1,\"url\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934192430\",\"name\":\"Why do construction approval cycles take so long?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Approval cycles often slow down because documents move through multiple reviewers using email, paper forms, and manual follow-ups. Limited visibility makes it difficult to know where documents are or who needs to approve them next.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934202442\",\"position\":2,\"url\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934202442\",\"name\":\"Which construction documents benefit from digital approvals?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Change orders, RFIs, inspection reports, subcontractor agreements, purchase requests, safety documentation, vendor onboarding forms, and project closeout documents are all commonly managed through digital approval workflows.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"},{\"@type\":\"Question\",\"@id\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934220947\",\"position\":3,\"url\":\"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934220947\",\"name\":\"Can project managers approve documents from a mobile device?\",\"answerCount\":1,\"acceptedAnswer\":{\"@type\":\"Answer\",\"text\":\"Yes. Modern document workflow platforms allow approvals from smartphones, tablets, and computers, helping office and field teams stay connected regardless of location.\",\"inLanguage\":\"en-US\"},\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Why the Construction Approval Process Stalls | DottedSign","description":"Why the construction approval process slows projects down, and how digital approval workflows help Texas contractors decide faster with full visibility.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles","og_locale":"en_US","og_type":"article","og_title":"Why the Construction Approval Process Stalls | DottedSign","og_description":"Why the construction approval process slows projects down, and how digital approval workflows help Texas contractors decide faster with full visibility.","og_url":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles","article_published_time":"2026-09-09T06:42:36+00:00","article_modified_time":"2026-09-09T06:56:22+00:00","og_image":[{"width":1536,"height":1024,"url":"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg","type":"image\/jpeg"}],"author":"Iris","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Iris","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#article","isPartOf":{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles"},"author":{"name":"Iris","@id":"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/44bdc62ef073ef5283eaf1fecef2a045"},"headline":"Why Construction Projects Lose Time During Approval Cycles\u2014and How Digital Signatures Help","datePublished":"2026-09-09T06:42:36+00:00","dateModified":"2026-09-09T06:56:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles"},"wordCount":1220,"image":{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage"},"thumbnailUrl":"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg","keywords":["B2B","contract management","Digital Transformation","workflow"],"articleSection":["Product"],"inLanguage":"en-US"},{"@type":["WebPage","FAQPage"],"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles","url":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles","name":"Why the Construction Approval Process Stalls | DottedSign","isPartOf":{"@id":"https:\/\/www.dottedsign.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage"},"image":{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage"},"thumbnailUrl":"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg","datePublished":"2026-09-09T06:42:36+00:00","dateModified":"2026-09-09T06:56:22+00:00","author":{"@id":"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/44bdc62ef073ef5283eaf1fecef2a045"},"description":"Why the construction approval process slows projects down, and how digital approval workflows help Texas contractors decide faster with full visibility.","breadcrumb":{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#breadcrumb"},"mainEntity":[{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934192430"},{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934202442"},{"@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934220947"}],"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#primaryimage","url":"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg","contentUrl":"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg","width":1536,"height":1024,"caption":"Construction project manager reviewing construction document approvals on a tablet in a jobsite office"},{"@type":"BreadcrumbList","@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u9996\u9801","item":"https:\/\/www.dottedsign.com\/blog"},{"@type":"ListItem","position":2,"name":"Why Construction Projects Lose Time During Approval Cycles\u2014and How Digital Signatures Help"}]},{"@type":"WebSite","@id":"https:\/\/www.dottedsign.com\/blog\/#website","url":"https:\/\/www.dottedsign.com\/blog\/","name":"","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.dottedsign.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/44bdc62ef073ef5283eaf1fecef2a045","name":"Iris","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.dottedsign.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/61e84ca1adb5f0ef3cd6a2ddad5f7718c3742518581cbafe8a35cc0022bb03c3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/61e84ca1adb5f0ef3cd6a2ddad5f7718c3742518581cbafe8a35cc0022bb03c3?s=96&d=mm&r=g","caption":"Iris"},"url":"https:\/\/www.dottedsign.com\/blog\/author\/iris"},{"@type":"Question","@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934192430","position":1,"url":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934192430","name":"Why do construction approval cycles take so long?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Approval cycles often slow down because documents move through multiple reviewers using email, paper forms, and manual follow-ups. Limited visibility makes it difficult to know where documents are or who needs to approve them next.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934202442","position":2,"url":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934202442","name":"Which construction documents benefit from digital approvals?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Change orders, RFIs, inspection reports, subcontractor agreements, purchase requests, safety documentation, vendor onboarding forms, and project closeout documents are all commonly managed through digital approval workflows.","inLanguage":"en-US"},"inLanguage":"en-US"},{"@type":"Question","@id":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934220947","position":3,"url":"https:\/\/www.dottedsign.com\/blog\/product\/construction-approval-cycles#faq-question-1788934220947","name":"Can project managers approve documents from a mobile device?","answerCount":1,"acceptedAnswer":{"@type":"Answer","text":"Yes. Modern document workflow platforms allow approvals from smartphones, tablets, and computers, helping office and field teams stay connected regardless of location.","inLanguage":"en-US"},"inLanguage":"en-US"}]}},"jetpack_featured_media_url":"https:\/\/www.dottedsign.com\/blog\/wp-content\/uploads\/2026\/09\/construction-approval-cycles-cover.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/posts\/1131236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/users\/35"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/comments?post=1131236"}],"version-history":[{"count":3,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/posts\/1131236\/revisions"}],"predecessor-version":[{"id":1131355,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/posts\/1131236\/revisions\/1131355"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/media\/1131309"}],"wp:attachment":[{"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/media?parent=1131236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/categories?post=1131236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dottedsign.com\/blog\/wp-json\/wp\/v2\/tags?post=1131236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}